COMPLETED PROJECTS

The Imperial, Mumbai

Contractor:Shapoorji Pallonji Co. Ltd.
Brand Used: Birla Super 53 Grade
India’s tallest luxury twin residential towers in the heart of South Mumbai. The Imperial is one of the city’s most recognisable real estate projects and one of the country’s most prestigious residences.

The Imperial, Mumbai

Contractor:Shapoorji Pallonji Co. Ltd.
Brand Used: Birla Super 53 Grade
India’s tallest luxury twin residential towers in the heart of South Mumbai. The Imperial is one of the city’s most recognisable real estate projects and one of the country’s most prestigious residences.

Mundra Ultra Mega Power Project, Gujarat

Customer: Tata Power
Brand Supplied: UltraTech Cement
The Coastal Gujarat Power Project is a mega power project that will have five units of 800 MW each, generating a total of 4000 MW. It was the largest Thermal Power plant in India when commisioned.

Mundra Ultra Mega Power Project, Gujarat

Customer: Tata Power
Brand Supplied: UltraTech Cement
The Coastal Gujarat Power Project is a mega power project that will have five units of 800 MW each, generating a total of 4000 MW. It was the largest Thermal Power plant in India when commisioned.

Mumbai Pune Express Highway Ghat Section

Contractor: Shapoorji Pallonji & Co. Ltd.
Brand Used: 53 Grade Birla Super
Ghat Section on Mumbai – Pune Express Highway between Khandala and Khopoli was awarded to Shapoorji Pallonji & Co. Ltd and 100% of the cement consumed in it was 53 Grade Birla Super. Out of total 96 kms, of expressway, 18 kms is Ghat and has all the 4 tunnels.

Mumbai Pune Express Highway Ghat Section

Contractor: Shapoorji Pallonji & Co. Ltd.
Brand Used: 53 Grade Birla Super
Ghat Section on Mumbai – Pune Express Highway between Khandala and Khopoli was awarded to Shapoorji Pallonji & Co. Ltd and 100% of the cement consumed in it was 53 Grade Birla Super. Out of total 96 kms, of expressway, 18 kms is Ghat and has all the 4 tunnels.

Mumbai Internaltional Airport Limited (T2)

Contractor: : Larson & Tubro Limited
Brand Used: UltraTech Cement Limited

Chhatrapati Shivaji International Airport (CSIA) Terminal 2
SOP: 100% UltraTech (Above 4 Lakh MT)

Mumbai Internaltional Airport Limited (T2)

Contractor: : Larson & Tubro Limited
Brand Used: UltraTech Cement Limited

Chhatrapati Shivaji International Airport (CSIA) Terminal 2
SOP: 100% UltraTech (Above 4 Lakh MT)

Jawaharlal Nehru Stadium Commonwealth Games. Delhi

Customer: Shapoorji Pallonji Co. Ltd.
Brand Used: UltraTech Cement
Jawaharlal Nehru Stadium was the main venue for the 2010 Commonwealth Games. It hosted the opening and closing ceremonies as well as athletics events for the Delhi Games. The stadium underwent massive redesign and reconstruction for the biggest multi-sport event hosted by India to that date. It was opened to the general public on 27 July 2010

Jawaharlal Nehru Stadium Commonwealth Games. Delhi

Customer: Shapoorji Pallonji Co. Ltd.
Brand Used: UltraTech Cement
Jawaharlal Nehru Stadium was the main venue for the 2010 Commonwealth Games. It hosted the opening and closing ceremonies as well as athletics events for the Delhi Games. The stadium underwent massive redesign and reconstruction for the biggest multi-sport event hosted by India to that date. It was opened to the general public on 27 July 2010

One Avighna Park, Mumbai

Customer: Nish Developers
Brand Supplied: UltraTech Concrete (Dedicated Ready-Mix Concrete Plant), UltraTech Cement, UltraTech Building Products.
One Avighna Park is recognized as the world’s best residential high-rise developmentby the International Property Awards, London – Dec 2012 and 2013.

One Avighna Park, Mumbai

Customer: Nish Developers
Brand Supplied: UltraTech Concrete (Dedicated Ready-Mix Concrete Plant), UltraTech Cement, UltraTech Building Products.
One Avighna Park is recognized as the world’s best residential high-rise developmentby the International Property Awards, London – Dec 2012 and 2013.

Vallarpadam Rail Bridge, Kochi

Contractor: Afcons Infrastructure Limited
Brand Supplied: Ultratech Cement
This is India’s longest rail bridge. This infrastructural marvel was completed in the record time of 27 months. The length of the bridge is 8 km and the elevated structure is of 4.62 km. This rail bridge has won multiple awards since its inception.

One Avighna Park, Mumbai

Customer: Nish Developers
Brand Supplied: UltraTech Concrete (Dedicated Ready-Mix Concrete Plant), UltraTech Cement, UltraTech Building Products.
One Avighna Park is recognized as the world’s best residential high-rise developmentby the International Property Awards, London – Dec 2012 and 2013.

Bharat Dimond Bourse

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Used: Birla Super 53 Grade Bharat Diamond Bourse (BDB) is the world's largest diamond bourse (exchange) and is located in Mumbai, India. Spread over a 20-acre plot, the Complex is home to some 2,500 small and large diamond traders in addition to the Custom House, banks and other service providers who cater to the gems and jewelry trade. There are 8 towers having 9 floors each. The total constructed area is 2,000,000 sq ft (190,000 m2), with two basements of additional 1,000,000 sq ft (93,000 m2).

Bharat Dimond Bourse

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Used: Birla Super 53 Grade Bharat Diamond Bourse (BDB) is the world's largest diamond bourse (exchange) and is located in Mumbai, India. Spread over a 20-acre plot, the Complex is home to some 2,500 small and large diamond traders in addition to the Custom House, banks and other service providers who cater to the gems and jewelry trade. There are 8 towers having 9 floors each. The total constructed area is 2,000,000 sq ft (190,000 m2), with two basements of additional 1,000,000 sq ft (93,000 m2).

Tata Motors Sanand, Gujarat

Customer: Shapoorji Pallonji Co. Ltd
Brand Used: UltraTech Cement
Tata Motors’ plant for the Tata Nano at Sanand, located in the Ahmedabad district of Gujarat. The capacity of the plant, to begin with, will be 250,000 cars per year to be achieved in phases, and with some balancing is expandable up to 350,000 cars per year. Built in a record time of 14 months starting November 2008, Spread over 725 acres.

Tata Motors Sanand, Gujarat

Customer: Shapoorji Pallonji Co. Ltd
Brand Used: UltraTech Cement
Tata Motors’ plant for the Tata Nano at Sanand, located in the Ahmedabad district of Gujarat. The capacity of the plant, to begin with, will be 250,000 cars per year to be achieved in phases, and with some balancing is expandable up to 350,000 cars per year. Built in a record time of 14 months starting November 2008, Spread over 725 acres.

Buddha International Circuit, Noida

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Used: Ultratech Cement
This is an Indian motor racing circuit in Greater Noida, Uttar Pradesh, India. Designed by the world-renowned architect Hermann Tike, the 5.14 kilometre-long circuit is one of the fastest, most exciting motor racing circuits in the world. This circuit hosted the annual Formula One Indian Grand Prix on 30th October 2011.

Buddha International Circuit, Noida

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Used: Ultratech Cement
This is an Indian motor racing circuit in Greater Noida, Uttar Pradesh, India. Designed by the world-renowned architect Hermann Tike, the 5.14 kilometre-long circuit is one of the fastest, most exciting motor racing circuits in the world. This circuit hosted the annual Formula One Indian Grand Prix on 30th October 2011.

Lulu Mall, Kochi

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Supplied: UltraTech Cement
LuLu Mall is the largest shopping mall in India, situated in the city of Kochi. It is one of the most visited places in Kerala. The mall was opened in March 2013. The estimated cost for this project is more than Rs 16 billion or US$250 million.

Lulu Mall, Kochi

Contractor: Shapoorji Pallonji Co. Ltd.
Brand Supplied: UltraTech Cement
LuLu Mall is the largest shopping mall in India, situated in the city of Kochi. It is one of the most visited places in Kerala. The mall was opened in March 2013. The estimated cost for this project is more than Rs 16 billion or US$250 million.

LNG Tank and Jetty at Kochi and Dahej

Customer: Afcons Infrastructure Limited
Brand Supplied: UltraTech Cement
The LNG Tank including Jetty at Dahej LNG Terminal and Kochi LNG Terminal.

LNG Tank and Jetty at Kochi and Dahej

Customer: Afcons Infrastructure Limited
Brand Supplied: UltraTech Cement
The LNG Tank including Jetty at Dahej LNG Terminal and Kochi LNG Terminal.

Domlur Flyover, Bangalore

Contractor: Uttar Pradesh State Bridge Corporation
Brand Used: Birla Super 53 Grade & Birla Ready-Mix Concrete

Domlur Flyover, Bangalore

Contractor: Uttar Pradesh State Bridge Corporation
Brand Used: Birla Super 53 Grade & Birla Ready-Mix Concrete

Symbiosis International University, Pune

Symbiosis International University, Pune

Birla Institute Of Technology & Science GOA

Birla Institute Of Technology & Science GOA

Nilwande Dam (NACC)

Nilwande Dam (NACC)

Mumbai Airport Runway by L&T

Mumbai Airport Runway by L&T

ON GOING PROJECTS

Jammu Udhampur Highway

Contractor: Afcons Infrastructure Limited
Brand Supplied: Ultratech Cement

Jammu Udhampur Highway

Contractor: Afcons Infrastructure Limited
Brand Supplied: Ultratech Cement

ONGC Oil wells

Customer: ONGC various locations in India.
Brand Supplies: Oil Well Cement of Shree Digvijay Cement Co Ltd.

ONGC Oil wells

Customer: ONGC various locations in India.
Brand Supplies: Oil Well Cement of Shree Digvijay Cement Co Ltd.

Arch Bridge - Chenab Bridge, Jammu and Kashmir

Contractor: Afcons Infrastructure Limited
Brand Supplied: Ultratech Cement
The arch-shaped steel structure is currently being constructed over the Chenab River between Bakkal and Kauri, in the Reasi district of Jammu and Kashmir. When completed, the bridge will be 1,315 metres long, with a 480 metre-long trussed arch span. It stands 359 metres above the river Chenab and has a 650 m long viaduct on the Kauri side. It is in the development stage.

Arch Bridge - Chenab Bridge, Jammu and Kashmir

Contractor: Afcons Infrastructure Limited
Brand Supplied: Ultratech Cement
The arch-shaped steel structure is currently being constructed over the Chenab River between Bakkal and Kauri, in the Reasi district of Jammu and Kashmir. When completed, the bridge will be 1,315 metres long, with a 480 metre-long trussed arch span. It stands 359 metres above the river Chenab and has a 650 m long viaduct on the Kauri side. It is in the development stage.

IREO Management Pvt. Ltd. (Projects in Gurgoan and Mohali)

Contractor: Various Contractors
Brand Used: UltraTech Cement

IREO Management Pvt. Ltd. (Projects in Gurgoan and Mohali)

Contractor: Various Contractors
Brand Used: UltraTech Cement

Kochi Metro

Contractors: L&T, SOMA, Macnally Bharat, Era and IRCON
Brand Supplies: UltraTech Cement and Concrete
25km Metro system for the city of Kochi in Kerala.

Kochi Metro

Contractors: L&T, SOMA, Macnally Bharat, Era and IRCON
Brand Supplies: UltraTech Cement and Concrete
25km Metro system for the city of Kochi in Kerala.

Ahmedabad Metro

Contractors: J Kumar, ILFS, Dineshchandra R Agrawal Infra, Ranjet
Brand Supplies: UltraTech Cement and Concrete
39km Metro-Link Express for Gandhinagar and Ahmedabad, abbreviated MEGA, or Ahmedabad Metro is an underconstruction mass-transit rail system for the cities of Ahmedabad and Gandhinagar in Gujarat

Ahmedabad Metro

Contractors: J Kumar, ILFS, Dineshchandra R Agrawal Infra, Ranjet
Brand Supplies: UltraTech Cement and Concrete
39km Metro-Link Express for Gandhinagar and Ahmedabad, abbreviated MEGA, or Ahmedabad Metro is an underconstruction mass-transit rail system for the cities of Ahmedabad and Gandhinagar in Gujarat

Navi Mumbai Metro

Contractors: J Kumar and NCC
Brand Supplies: UltraTech Cement and Concrete
23km The Navi Mumbai Metro is a rapid transit system under construction in Navi Mumbai, Maharashtra

Navi Mumbai Metro

Contractors: J Kumar and NCC
Brand Supplies: UltraTech Cement and Concrete
23km The Navi Mumbai Metro is a rapid transit system under construction in Navi Mumbai, Maharashtra